top of page

PRE-ENGINEERED SYSTEM WINDOWS

4c8df4_497f571d86d94bed80c83fd36acb7622~mv2.webp

JAPANESE ENGINEERING & TOSTEM QUALITY

The traditional method of manufacturing uses very little mechanization and follows the batch production process. Fabrication & assembly is done partly at the factory and partly at the site. The entire process is slow and quality is very much dependent on the worker’s skill at the installation stage. There are a lot of points where quality can be diluted and hence the actual performance is compromised. The process of Pre Engineered Windows (PEW) is similar to pre-engineered buildings, where the building is designed and fabricated at the factory, and only the assembly of different components is done at the site in a quick burst of speed using nuts or bolts.

© 2035 by Knoll & Walters LLP. Powered and secured by Wix

bottom of page